PALACE OF CULTURE PJSC
INFORMATION
  • Location
    Gorlovka, blvd. Dimitrova, 74
  • Customer
    PJSC
  • Architect
    AKB
  • General contractor
    LLC
  • Total area
    13 200 m2
  • Implementation period
    2013 - June 2014
  • Capacity
    1200 people
SHARE

PALACE OF CULTURE PJSC "CONCERN STYROL"

As soon as possible, a comprehensive project was developed, including: changing the architectural appearance of the building, interior design and landscaping, exterior and interior engineering systems.


COMPLETED WORKS

DESIGN AND INSTALLATION:

  • water supply and sewage systems
  • heating, ventilation and air conditioning systems
  • power supply systems (electrical equipment, electric lighting)
  • security systems
  • communication systems
  • Automated Building Management System (BMS)

DEVELOPMENT OF THE CONCEPT:

  • project and implementation of work to improve the adjacent territory
  • interior design

MANUFACTURE AND INSTALLATION:

  • facade structures
  • decoration elements of the auditorium, dance halls, foyer

GENERAL CONTRACT SERVICES

DESCRIPTION OF THE OBJECT:

As soon as possible, a comprehensive project was developed, including: changing the architectural appearance of the building, design of interiors and landscaping, projects of external and internal engineering systems. Facade structures, entrance groups were created and mounted, landscaping of the adjacent territory was completed. Reconstruction of all internal premises.


Optional: In the concert hall, designed for 1200 spectators, wall and ceiling decor elements were designed and installed, new chairs were installed, the stage was reconstructed .


Rate this article ( 0 Vote )

About The Author